Maintenance dredging Elbe 2013 - 2016

Hydraulic Engineering
Location: Elbe, Germany, Europe VIEW PROJECT
#Elbe, Germany, Europe on Boskalis Flickrstream
Back to project overview
typo3temp/pics/b44fad8ed6.jpg

Barth Pier (second construction section)

Hydraulic Engineering
Location: Barth, Germany, EuropeVIEW PROJECT
typo3temp/pics/13005e81fa.jpg

Groyne construction Cuxhaven Otterndorf

Hydraulic Engineering
Location: Cuxhaven Otterndorf, Germany, EuropeVIEW PROJECT
#Cuxhaven Otterndorf on Boskalis Flickrstream
Back to project overview

Hydraulic construction projects

Heinrich Hirdes GmbH has been active successfully in a variety of working areas of hydraulic construction for more than 100 years. The core areas of our company are navigable construction of waterways and their maintenance, canal, sluice and harbour construction in close connection with dyke, earth and ground construction, as well as structural measures for coastal protection.

Maintenance dredging Elbe 2013 - 2016

(2013-2016)

In May 2013, the Wasser- und Schifffahrtsamt Cuxhaven charged us with maintaining the officially specified shipping channels in the Elbe. The length of the channels to be maintained amounts to...

Elbe culvert removal

(2015)

Gasunie Deutschland and Open Grid Europe are the operators of the Elbe culvert and clients for the removal. The gas culvert to be removed was laid in 1972 across the Elbe and Gasunie decommissioned...

Barth Pier (second construction section)

Germany (2011-2012)

The Barth Pier was one of the third-largest coastal protection measures in Mecklenburg-Western Pomerania and the construction costs amounted to Euro 12.2 million. The client for the construction was...

Groyne construction Cuxhaven Otterndorf

Germany (2011-2012)

We built 24 groynes in the Otterndorf bank area for WSA Cuxhaven. The order volume for this project amounted to Euro 33 million. The project was carried out by a joint venture.

page 1 of 1:
1 |